Gallery

How borehole drilling rigs arrive (water and geothermal boreholes)
How borehole drilling rigs arrive (water and geothermal boreholes)
Synergy cooperates with Isoenergy, an expert renewables partner.
Synergy cooperates with Isoenergy, an expert renewables partner.
Synergy announces cooperation with Wessex Group, Renewables Division    (see News)
Synergy announces cooperation with Wessex Group, Renewables Division (see News)
Two of our three Comacchio rigs
Two of our three Comacchio rigs
Synergy have selected by HUF  to drill geothermal boreholes for HUF houses in the UK
Synergy have selected by HUF to drill geothermal boreholes for HUF houses in the UK
Geothermal borehole drilling in the Cotswolds
Geothermal borehole drilling in the Cotswolds
32KW GSHP System with cooling : Courtesy Isoenergy
32KW GSHP System with cooling : Courtesy Isoenergy
Official drilling partner for NIBE Ground Source Heat Pumps
Official drilling partner for NIBE Ground Source Heat Pumps
Synergy cooperate with KENSA, the UK's only quality GSHP manufacturer
Synergy cooperate with KENSA, the UK's only quality GSHP manufacturer
Comacchio MC450P.1 drilling rig with automated drill rod handling.
Comacchio MC450P.1 drilling rig with automated drill rod handling.
Synergy use heat pumps from leading manufacturers
Synergy use heat pumps from leading manufacturers
Synergy use high quality geothermal probes, Courtesy Geothermal Supplies Ltd.
Synergy use high quality geothermal probes, Courtesy Geothermal Supplies Ltd.
High Quality Components
High Quality Components
The Synergy offer
The Synergy offer
MC450P.1 with rod handling in Kent
MC450P.1 with rod handling in Kent
Drilling 6*120m at St. Catherines Grade 1 listed building
Drilling 6*120m at St. Catherines Grade 1 listed building
Synergy use the latest prefabricated manifold chambers for larger installations
Synergy use the latest prefabricated manifold chambers for larger installations
Drilling at HUF Haus using Stiebel Eltron GSHP
Drilling at HUF Haus using Stiebel Eltron GSHP
Prefabricated manifold chambers for up to 30 boreholes
Prefabricated manifold chambers for up to 30 boreholes
Synergy adopts German components as used by HUF Haus for UK installations
Synergy adopts German components as used by HUF Haus for UK installations
Mud Puppy (recycling of cleaned borehole drilling fluid)
Mud Puppy (recycling of cleaned borehole drilling fluid)
Geothermal Borehole Drilling for Isoenergy in Lympne
Geothermal Borehole Drilling for Isoenergy in Lympne
Drilling in a difficult location: Highgate, London
Drilling in a difficult location: Highgate, London
MC450P arriving on site in the Cotswolds
MC450P arriving on site in the Cotswolds
Geothermal drilling in Stratford upon Avon for Geothermique
Geothermal drilling in Stratford upon Avon for Geothermique
Geothermal borehole grouting kit with powerful grout mixing unit.
Geothermal borehole grouting kit with powerful grout mixing unit.
100m geothermal boreholes in Beaconsfield
100m geothermal boreholes in Beaconsfield
MC 450 and MC450P.1 Comacchio rigs
MC 450 and MC450P.1 Comacchio rigs
Synergy use the latest prefabricated geothermal manifold chambers.
Synergy use the latest prefabricated geothermal manifold chambers.
Multiple geothermal boreholes Headington, Oxford
Multiple geothermal boreholes Headington, Oxford
17KW GSHP Plant room (1) : Courtesy Isoenergy
17KW GSHP Plant room (1) : Courtesy Isoenergy
32KW GSHP Plant Room, Premier Inn : Courtesy Isoenergy
32KW GSHP Plant Room, Premier Inn : Courtesy Isoenergy
11KW GSHP Plant Room : Courtesy Isoenergy
11KW GSHP Plant Room : Courtesy Isoenergy
90KW GSHP Plant Room : Courtesy Isoenergy
90KW GSHP Plant Room : Courtesy Isoenergy
40KW GSHP Plant Room : Courtesy Isoenergy
40KW GSHP Plant Room : Courtesy Isoenergy
Donnington Grove Country Club, Multiple Geothermal Boreholes
Donnington Grove Country Club, Multiple Geothermal Boreholes
17KW GSHP Plant Room         : Courtesy Isoenergy
17KW GSHP Plant Room : Courtesy Isoenergy
Geothermal drilling in Chippenham
Geothermal drilling in Chippenham
17KW GSHP Plant Room (2) : Courtesy Isoenergy
17KW GSHP Plant Room (2) : Courtesy Isoenergy
Five 115m Geothermal boreholes at Haileybury School
Five 115m Geothermal boreholes at Haileybury School
Synergy uses high quality UV sterilization units,        Photo courtesy Silverline
Synergy uses high quality UV sterilization units, Photo courtesy Silverline
MC 405 (Water and geothermal boreholes to 150m)
MC 405 (Water and geothermal boreholes to 150m)
MC405 & Mud Puppy (water borehole in Sonning)
MC405 & Mud Puppy (water borehole in Sonning)
Water borehole drilling for dairy supply at Waltham Place
Water borehole drilling for dairy supply at Waltham Place
Drilling Setup (60m water borehole in Sonning)
Drilling Setup (60m water borehole in Sonning)
Our irrigation division is rapidly expanding, with new personnel and equipment
Our irrigation division is rapidly expanding, with new personnel and equipment
Synergy use industry leading components for borehole/irrigation systems
Synergy use industry leading components for borehole/irrigation systems
26000 Gallon storage tank (irrigation) installed at Panshanger Golf Complex
26000 Gallon storage tank (irrigation) installed at Panshanger Golf Complex
Water borehole drilling in chalk in Taplow
Water borehole drilling in chalk in Taplow
Automated UV Unit with UV tube monitoring
Automated UV Unit with UV tube monitoring
Bespoke irrigation systems with zoned, programmable sprinkler/mister arrays.
Bespoke irrigation systems with zoned, programmable sprinkler/mister arrays.